Hoppa till innehåll

Webbinarium

2023-04-21 Uppumpning av vatten under bank

Beskrivning

BIG projekt A2020-07
Uppumpning av vatten från jord under bankar
Utförare: T. Do / J. Laue, LTU
FoI-handläggare: E-L. Olsson, Trafikverket

Om projektet:

”A long term issue involved the efficient operation of heavy haul tracks is the migration of fluidized fines from the shallow soft subgrade to the overlying ballast, i.e., mud pumping. Mud pumping phenomenon involves the development of excess pore water pressure under active cyclic loading. For that reason, this project will focus on the investigation of the excess pore water pressure generated in subgrade soils. Subgrade soil specimens will be tested with cyclic triaxial testing system. The outputs from the testing program will be employed in advanced constitutive model in numerical studies.”

Webbinarium arkiv

Kontakt

Hittar du inte det du söker?

Saknas din fråga eller behöver du mer detaljer? Kontakta oss så guidar vi dig rätt till projekt, material eller kommande webbinarium.